next»»
Trench shall be excavated to approximate size of the tank.
The bottom of the trench should be level and there should be no sharp rocks.
Recommended coverage over the tank should be approximately 18".
Second trench approximately the size of the tank should be excavated for the soak away-pit.
This should be approximately 3m away from the septic tank.
Preferably made in the direction of flow of water.
Excavation:
Siting:
Sewage system should be as far away from habitable buildings as is economically possible.
Good road access should be provided to enable tank-emptying vehicles to operate its suction-lift capabilities.